Update on the status of the two Million Shillings Allocated Towards Hilltop Bridge

Prior to the controversial bridge which was recently built at Hilltop Road by the firm building the SGR, Kajiado North CDF had allocated 2 million shillings towards the same bridge. The money was deposited in the account of Hilltop Road Community (CBO) at Equity Bank. Shortly afterwards, Ksh500,000 of the 2 million shillings was allocated…

Read More